Zimbabwe
1×260 t/h boiler + 50 MW steam turbine generator, EPC
Rooted in China · Reaching the World

From our workshop in Zibo, Shandong to job sites in Pakistan and Zimbabwe — the full list of projects Tanghan has delivered or is building, plus photos taken on site.
Pakistan is our core overseas market, extending to Africa and Northeast Asia, where we deliver coal–biomass co-firing and pure biomass units on an EPC basis.
1×260 t/h boiler + 50 MW steam turbine generator, EPC
2×130 t/h coal–biomass co-firing boilers + 2×25 MW power generation
1×75 t/h boiler + one 15 MW steam turbine power station
1×130 t/h biomass power project + 1×20 MW steam turbine generator
1×130 t biomass boiler + 30 MW steam turbine generator, EPC
Filter by delivery mode. Numbering follows the company's original record.
44 projects
1×30 MW steam turbine generator, complete unit supply
Complete Unit Supply1×110 t/h boiler + 1×30 MW off-gas power generation, EPC
EPC1×130 t/h boiler + 1×30 MW off-gas power unit, complete supply
Complete Unit Supply1×25 MW steam turbine generator, complete unit supply
Complete Unit Supply1×12 MW steam turbine generator, EPC
EPC1×30 MW steam turbine generator, complete unit supply
Complete Unit Supply2×60 MW steam turbine generators, PC
PC (Procure & Construct)1×30 MW steam turbine generator, PC
PC (Procure & Construct)1×12 MW second-hand turbine generator, PC
PC (Procure & Construct)25 t/h boiler + 1.5 MW turbine generator, complete supply
Complete Unit Supply1×135 MW (WX21Z-085LLT) motor-driven impulse generator set, EPC
EPC1×18 MW plant dismantling, transport and installation, EPC
EPC3×130 t/h boilers + 2×15 MW cogeneration, complete supply
Complete Unit Supply1×18 MW steam turbine generator, complete unit supply
Complete Unit Supply1×15 MW steam turbine generator, PC
PC (Procure & Construct)1×15 MW (QFW-15-2A) generator, complete unit supply
Complete Unit Supply1×6 MW waste heat power unit, complete supply
Complete Unit Supply1×12 MW (S12-1.27) turbine overhaul and complete equipment installation
Installation · Overhaul · Commissioning1×6 MW steam turbine generator, EPC
EPCUnit overhaul project
Installation · Overhaul · CommissioningUnit overhaul project
Installation · Overhaul · CommissioningUnit overhaul project
Installation · Overhaul · Commissioning1×130 t/h boiler + 1×15 MW cogeneration unit, full commissioning
Installation · Overhaul · Commissioning1×60 t/h industrial boiler installation
Installation · Overhaul · Commissioning1×12 MW steam turbine generator, complete unit supply
Complete Unit Supply1×4.5 MW turbine generator set, sale
Equipment Trading1×4.5 MW waste heat power generation, EPC
EPC1×75 t/h biomass boiler + 1×18 MW turbine generator, complete supply
Complete Unit Supply1×3 MW steam turbine generator, PC
PC (Procure & Construct)1×12 MW waste heat power generation, EPC
EPC1×6 MW steam turbine generator, complete unit supply
Complete Unit Supply1×130 t/h boiler + 1×15 MW turbine generator, complete supply
Complete Unit Supply1×1.5 MW back-pressure turbine generator, complete supply
Complete Unit Supply1×20 t/h boiler + 1×3 MW turbine generator, complete supply
Complete Unit Supply1×15 MW steam turbine, complete unit supply
Complete Unit Supply1×6 MW steam turbine generator, complete unit supply
Complete Unit Supply1×15 MW steam turbine generator, complete unit supply
Complete Unit Supply2×130 t HTHP boilers + 1×C25-8.83/1.8/0.8 turbine generator, EPC contract
EPC1×30 MW generator, complete unit supply
Complete Unit SupplySecond-hand switchgear sales contract
Equipment Trading3.5 MW steam turbine generator, complete unit supply
Complete Unit SupplySteam turbine driven compressor project, EMC contract
Energy Management ContractingBlast furnace gas power generation, energy management contract (EMC)
Energy Management Contracting30 MW steam turbine replacement, EPC
EPC51 site photos in 6 albums by construction stage, mainly from the ZRK 2×130 t/h boiler erection project in Pakistan and our Zibo workshop.
From ground assembly to full-height erection — steel frames, top girders and casing panels rise layer by layer, setting the pace of the whole plant schedule.
Water walls, economisers, headers and main piping — fit-up, welding and sealing decide whether the unit fires up first time and runs safely for years.
Rotor lifting and turning, cylinder opening, alignment and clearance checks — our own overhaul crews restore even second-hand units to factory standard.
Precipitators, cyclones, ID fans and flue ducts are the last gate to compliant emissions — columns, shells and hoppers installed and aligned section by section.
From piling and pile caps to the main building frame and concrete stack, civil works interleave with erection to compress the overall schedule.
Boiler drums and key components are made in our own Zibo workshop; overseas projects are delivered by Chinese supervisors working alongside local crews.